The shell and the steps are sprayed and looking great. We’re watering it twice a day while it cures, so it comes out strong. Tile and coping start next week.
Pool design, tile and coping picks, permit and utility locates.
The permit is approved and the locates are clear! The plan has the 16 by 32 pool with wide steps at the house end, blue glass waterline tile, travertine coping and a broom-finish deck all round.
Lay out the pool, dig it to depth and haul the dirt.
The pool is dug to depth and the dirt is hauled away. The inspector checks the layout tomorrow, then the steel goes in.
Tie the rebar cage, run the plumbing and the light conduit, inspection.
The steel is tied, the plumbing and the light conduit are in, and the inspection passed this morning. Gunite is booked for Monday.
Spray the concrete shell and steps, then keep it wet for a week while it cures.
The shell and the steps are sprayed and looking great. We’re watering it twice a day while it cures, so it comes out strong. Tile and coping start next week.
Set the blue glass waterline tile and the travertine coping.
Form, steel and pour the broom-finish concrete deck.
White plaster finish, then fill the pool.
Start the equipment, balance the water and set the lights on a timer.
Clean-up and pool school: the equipment, the chemistry and the app, with you.