
The wall and both steps are built and capped. The patio base is compacted and the sand is screeded, and your pavers are on site, so laying starts as soon as the base is checked.
Yard design, materials and plants, utility locates booked.
Design is approved and the utility locates are clear! The plan has the charcoal paver patio off the back door, a curved stone wall with wide steps up to the lawn, and the planting bed with your Japanese maple.
Break out the old patio, strip the old sod and dig out for the new yard.
The old concrete patio and the old sod are out and hauled away. The excavator is done, so grading starts tomorrow.
Shape the yard, lay the drain line behind the wall, stake the patio.
The yard is graded so everything drains away from the house, and the drain line is in behind where the wall goes. The patio edge is staked so you can see its size.
Build the stone wall and steps, compact the gravel base and screed the sand.
The wall and both steps are built and capped. The patio base is compacted and the sand is screeded, and your pavers are on site, so laying starts as soon as the base is checked.
Lay the charcoal pavers, cut the edges, edge restraint and polymeric sand.
Topsoil, the Japanese maple, shrubs, grasses and mulch.
Final grade and fresh sod on the raised lawn.
Low-voltage path lights along the wall and steps, on a timer.
Clean-up, watering plan and a walkthrough with you.